New build · 7 min read
Planning your own grand design: a step-by-step guide
From finding the plot to appointing a builder, the stages of designing your own home and where people go wrong.

Building a one-off home is a huge undertaking, and the decisions you make in the first few months have the biggest effect on cost, quality and how much you'll love living there. Here's how a design-led self build comes together.
1. Understand the plot before you buy
Check the planning history, constraints such as Green Belt or a conservation area, access, services, ground conditions and trees. A feasibility study before you buy can save a great deal of money and heartache.
2. Write the brief around how you live
Before thinking about style, think about life: how you cook, entertain, work, relax and grow older. A good brief is about the rooms you need and how they connect, not just the number of bedrooms.
3. Concept design and 3D
Explore options in plan and in 3D. This is the cheapest point to change your mind, so take your time and test the ideas properly.
4. See it before you build it
Photoreal renders let you walk around the finished house, check views and materials, and share the design with family, neighbours and the planning officer.
5. Planning, then technical design
Secure planning permission, then develop the building regulations drawings with your structural engineer. Add a tender package so builders quote on exactly the same information.
6. Choose your builder carefully
Compare like-for-like tenders, check references and agree a clear contract. Contract administration can protect you during the build.
Our grand design and barn-inspired projects show where this process can lead. Start with a free discovery meeting. Start a project.
This guide is general information for projects in England and isn’t a substitute for advice on your specific site. Rules change; we’ll always check the current position for your project.
Keep reading
More from the journal

Planning6 min read
Do I need planning permission for an extension?
Permitted development, prior approval or a full householder application: how to tell which route your extension needs.
Read
HMO7 min read
HMOs and Article 4 in Nottingham: what investors need to know
Why Nottingham's Article 4 direction changes the HMO game, and how a well-designed scheme can still succeed.
Read
Process5 min read
Planning permission vs building regulations: what's the difference?
Two separate approvals, two different questions. Here's what each one covers and when you need it.
ReadFree initial consultation
Let’s designyour home.
Every project starts with a free discovery meeting. Tell us what you’re planning and we’ll guide you from the first sketch to construction drawings.
project